National Repository of Grey Literature 7 records found  Search took 0.01 seconds. 
Installation of reinforced concrete skeleton of hockey hall
Stupka, Matouš ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this bachelor thesis is the solution of implementation of the assembly stage of the reinforced concrete skeleton of the hockey hall in Kuřim. This thesis contains a technical report focusing on the skeleton assembly, the situation of the construction with broader transport relations, bill of quantities, technological regulation for skeleton assembly, construction organization solution, time schedule, machine assembly design, control and test plan, safety and health protection on construction site plan and transport of excessive and oversized loads solution. The annexes contain drawings of the passages through critical points on the route, a drawing of the construction site facilities, item budget, prefabricated supply scheme, drawings of component assembly diagrams and a graph of workers needs.
Air Conditioning of hockey arena
Zach, Daniel ; Uher, Pavel (referee) ; Blasinski, Petr (advisor)
The bachelor thesis deals with the design of the HVAC system for the hockey hall. In the building, which is divided into three parts, the hockey arena "A", the hockey arena "B" and the facilities are solved. The ventilation system provides forced ventilation and regulates the air that is supplied. The devices are designed to meet hygiene requirements.
Steel load-bearing structure of a hockey hall
Laža, Matěj ; Štrba, Michal (referee) ; Balázs, Ivan (advisor)
The content of this bachelor thesis is a design solution of supporting steel structure for ice-hockey hall in Brno. The square plan dimensions are 40 x 75 m. The main supporting system is composed of truss girders. On the one side the truss girders are pinned on column, on the other side they are pinned into foundation. Centre to centre spacing of truss girders is 12 m. The highest point of truss girder is 18,5 m above the ground. The roof cladding is made of sandwich panels and is supported by truss purlins. Space stability is ensured by cross bracing and longitudinal bracing.
Training ice stadium with accommodation Lhota u Vsetína – construction technology project
Marčík, Filip ; Valenta, Michal (referee) ; Biely, Boris (advisor)
The aim of this diploma thesis is the development of a construction technology project for the construction of the training winter stadium with accommodation in Lhota u Vsetína. As part of this work, a technical report on the construction technology project, a study of the implementation of the main technological stages and the coordination situation of the construction, including solutions for the transport of key elements, are prepared. The work also deals first with the object time and financial plan of the construction, and then also the time plan of the main construction object and the plan for the provision of material resources for the complete stage of the construction, including the itemized budget. In a separate chapter, the work deals with the design of construction site equipment and the related technical report. Last but not least, the design of the main machine assemblies, the technological regulation and control test plan for the execution of drilled piles, a noise study and a specialized chapter dealing with winter measures during concreting, including their financial comparison, are dealt with here.
Installation of reinforced concrete skeleton of hockey hall
Stupka, Matouš ; Venkrbec, Václav (referee) ; Vlčková, Jitka Laura (advisor)
The subject of this bachelor thesis is the solution of implementation of the assembly stage of the reinforced concrete skeleton of the hockey hall in Kuřim. This thesis contains a technical report focusing on the skeleton assembly, the situation of the construction with broader transport relations, bill of quantities, technological regulation for skeleton assembly, construction organization solution, time schedule, machine assembly design, control and test plan, safety and health protection on construction site plan and transport of excessive and oversized loads solution. The annexes contain drawings of the passages through critical points on the route, a drawing of the construction site facilities, item budget, prefabricated supply scheme, drawings of component assembly diagrams and a graph of workers needs.
Air Conditioning of hockey arena
Zach, Daniel ; Uher, Pavel (referee) ; Blasinski, Petr (advisor)
The bachelor thesis deals with the design of the HVAC system for the hockey hall. In the building, which is divided into three parts, the hockey arena "A", the hockey arena "B" and the facilities are solved. The ventilation system provides forced ventilation and regulates the air that is supplied. The devices are designed to meet hygiene requirements.
Steel load-bearing structure of a hockey hall
Laža, Matěj ; Štrba, Michal (referee) ; Balázs, Ivan (advisor)
The content of this bachelor thesis is a design solution of supporting steel structure for ice-hockey hall in Brno. The square plan dimensions are 40 x 75 m. The main supporting system is composed of truss girders. On the one side the truss girders are pinned on column, on the other side they are pinned into foundation. Centre to centre spacing of truss girders is 12 m. The highest point of truss girder is 18,5 m above the ground. The roof cladding is made of sandwich panels and is supported by truss purlins. Space stability is ensured by cross bracing and longitudinal bracing.